CVE intelligence and bounded remediation
CVE-2018-9347 — In function SMF_ParseMetaEvent of file eas_smf.c there is incorrect input validation causing an infinite loop
Medium
CVSS 6.5
In function SMF_ParseMetaEvent of file eas_smf.c there is incorrect input validation causing an infinite loop. This could lead to a remote temporary DoS with no additional execution privileges needed. User interaction is needed for exploitation. Product: Android. Versions: Android-7.0 Android-7.1.1 Android-7.1.2 Android-8.0 Android-8.1 Android-9. Android ID: A-68664359
- Severity
- Medium
- CVSS
- 6.5 (3.0)
- Published
- 2018-11-14
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-20
Affected products
- google / android / 7.0
- google / android / 7.1.1
- google / android / 7.1.2
- google / android / 8.0
- google / android / 8.1
- google / android / 9.0
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.