CVE intelligence and bounded remediation
CVE-2018-7920 — Huawei Ar1200 Firmware security vulnerability
Huawei AR1200 V200R006C10SPC300, AR160 V200R006C10SPC300, AR200 V200R006C10SPC300, AR2200 V200R006C10SPC300, AR3200 V200R006C10SPC300 devices have an improper resource management vulnerability. Due to the improper implementation of ACL mechanism, a remote attacker may send TCP messages to the management interface of the affected device to exploit this vulnerability. Successful exploit could exhaust the socket resource of management interface, leading to a DoS condition.
- Severity
- High
- CVSS
- 7.5 (3.0)
- Published
- 2018-04-19
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-400
Affected products
- huawei / ar1200_firmware / v200r006c10spc300
- huawei / ar160_firmware / v200r006c10spc300
- huawei / ar200_firmware / v200r006c10spc300
- huawei / ar2200_firmware / v200r006c10spc300
- huawei / ar3200_firmware / v200r006c10spc300
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.