CVE intelligence and bounded remediation
CVE-2018-6922 — Freebsd Freebsd security vulnerability
One of the data structures that holds TCP segments in all versions of FreeBSD prior to 11.2-RELEASE-p1, 11.1-RELEASE-p12, and 10.4-RELEASE-p10 uses an inefficient algorithm to reassemble the data. This causes the CPU time spent on segment processing to grow linearly with the number of segments in the reassembly queue. An attacker who has the ability to send TCP traffic to a victim system can degrade the victim system's network performance and/or consume excessive CPU by exploiting the inefficiency of TCP reassembly handling, with relatively small bandwidth cost.
- Severity
- Medium
- CVSS
- 5.3 (3.0)
- Published
- 2018-08-09
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-400
Affected products
- freebsd / freebsd / 10.4
- freebsd / freebsd / 11.1
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.