CVE intelligence and bounded remediation

CVE-2018-1121 — procps-ng, procps is vulnerable to a process hiding through race condition

Medium CVSS 5.9

procps-ng, procps is vulnerable to a process hiding through race condition. Since the kernel's proc_pid_readdir() returns PID entries in ascending numeric order, a process occupying a high PID can use inotify events to determine when the process list is being scanned, and fork/exec to obtain a lower PID, thus avoiding enumeration. An unprivileged attacker can hide a process from procps-ng's utilities by exploiting a race condition in reading /proc/PID entries. This vulnerability affects procps and procps-ng up to version 3.3.15, newer versions might be affected also.

Severity
Medium
CVSS
5.9 (3.0)
Published
2018-06-13
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-367, CWE-362

Affected products

  • procps_project / procps

Matched remediation archetype

Race condition, TOCTOU, and lifecycle synchronization

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
  • Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
  • Identify clustered and multi-process behavior that repository-local tests may not represent.

Remediate safely

  • Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
  • Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
  • Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.