CVE intelligence and bounded remediation

CVE-2018-0473 — Cisco Ios security vulnerability

High CVSS 8.6

A vulnerability in the Precision Time Protocol (PTP) subsystem of Cisco IOS Software could allow an unauthenticated, remote attacker to cause a denial of service (DoS) condition of the Precision Time Protocol. The vulnerability is due to insufficient processing of PTP packets. An attacker could exploit this vulnerability by sending a custom PTP packet to, or through, an affected device. A successful exploit could allow the attacker to cause a DoS condition for the PTP subsystem, resulting in time synchronization issues across the network.

Severity
High
CVSS
8.6 (3.0)
Published
2018-10-05
CISA KEV
Not currently listed
Ecosystem
operating-system
Weaknesses
CWE-399

Affected products

  • cisco / ios / 15.2(4)e
  • cisco / ios / 15.2(5)

Matched remediation archetype

Resource exhaustion and denial of service

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
  • Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
  • Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.

Remediate safely

  • Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
  • Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
  • Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.