CVE intelligence and bounded remediation
CVE-2018-0378 — Cisco Nx-Os security vulnerability
A vulnerability in the Precision Time Protocol (PTP) feature of Cisco Nexus 5500, 5600, and 6000 Series Switches running Cisco NX-OS Software could allow an unauthenticated, remote attacker to cause a denial of service (DoS) condition on an affected device. The vulnerability is due to a lack of protection against PTP frame flood attacks. An attacker could exploit this vulnerability by sending large streams of malicious IPv4 or IPv6 PTP traffic to the affected device. A successful exploit could allow the attacker to cause a DoS condition, impacting the traffic passing through the device.
- Severity
- High
- CVSS
- 8.6 (3.0)
- Published
- 2018-10-17
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-20
Affected products
- cisco / nx-os / 7.3(2)n1(0.8)
Matched remediation archetype
Resource exhaustion and denial of service
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Identify attacker-influenced work factors including input size, nesting, compression, fan-out, regex cost, allocation, recursion, retries, and connection lifetime.
- Map per-request and shared CPU, memory, disk, descriptor, thread, queue, and downstream-service limits.
- Determine whether authentication, tenancy, quotas, and rate controls apply before expensive processing begins.
Remediate safely
- Bound input size, nesting, expansion, work, concurrency, queue depth, retries, and execution time before resource-intensive processing.
- Release resources on every success, error, cancellation, and timeout path and use backpressure instead of unbounded buffering.
- Update affected components and add small deterministic tests that assert resource ceilings rather than exhausting a host.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.