CVE intelligence and bounded remediation

CVE-2018-0027 — Receipt of a crafted or malformed RSVP PATH message may cause the routing protocol daemon (RPD) to hang or crash

High CVSS 7.5

Receipt of a crafted or malformed RSVP PATH message may cause the routing protocol daemon (RPD) to hang or crash. When RPD is unavailable, routing updates cannot be processed which can lead to an extended network outage. If RSVP is not enabled on an interface, then the issue cannot be triggered via that interface. This issue only affects Juniper Networks Junos OS 16.1 versions prior to 16.1R3. This issue does not affect Junos releases prior to 16.1R1.

Severity
High
CVSS
7.5 (3.0)
Published
2018-07-11
CISA KEV
Not currently listed
Ecosystem
operating-system
Weaknesses
CWE-20

Affected products

  • juniper / junos / 16.1

Showing 1 representative product identities from 2 source matches. Confirm exact affected versions with the linked vendor and NVD evidence.

Matched remediation archetype

General vulnerability remediation

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
  • Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
  • Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.

Remediate safely

  • Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
  • Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
  • Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.