CVE intelligence and bounded remediation
CVE-2017-9855 — An issue was discovered in SMA Solar Technology products
An issue was discovered in SMA Solar Technology products. A secondary authentication system is available for Installers called the Grid Guard system. This system uses predictable codes, and a single Grid Guard code can be used on any SMA inverter. Any such code, when combined with the installer account, allows changing very sensitive parameters. NOTE: the vendor reports that Grid Guard is not an authentication feature; it is only a tracing feature. Also, only Sunny Boy TLST-21 and TL-21 and Sunny Tripower TL-10 and TL-30 could potentially be affected
- Severity
- Critical
- CVSS
- 9.8 (3.1)
- Published
- 2017-08-05
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-863
Affected products
- sma / sunny_boy_3600_firmware
- sma / sunny_boy_5000_firmware
- sma / sunny_tripower_core1_firmware
- sma / sunny_tripower_15000tl_firmware
- sma / sunny_tripower_20000tl_firmware
- sma / sunny_tripower_25000tl_firmware
Matched remediation archetype
Authorization bypass, IDOR, and cross-tenant access
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map object and action authorization checks across API, UI, batch, import/export, and background-job paths.
- Identify tenant, ownership, role, and policy boundaries for affected resources and administrative operations.
- Use synthetic fixtures to compare intended access matrices without accessing another user's real data.
Remediate safely
- Enforce server-side authorization at each resource access and state transition using the authenticated principal and trusted tenant context.
- Scope data queries by tenant and ownership; treat client-supplied identifiers, roles, and policy claims as untrusted.
- Add deny-by-default policy tests for horizontal and vertical access across every affected transport.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.