CVE intelligence and bounded remediation
CVE-2017-6144 — F5 Big-Ip Policy Enforcement Manager security vulnerability
In F5 BIG-IP PEM 12.1.0 through 12.1.2 when downloading the Type Allocation Code (TAC) database file via HTTPS, the server's certificate is not verified. Attackers in a privileged network position may be able to launch a man-in-the-middle attack against these connections. TAC databases are used in BIG-IP PEM for Device Type and OS (DTOS) and Tethering detection. Customers not using BIG-IP PEM, not configuring downloads of TAC database files, or not using HTTP for that download are not affected.
- Severity
- High
- CVSS
- 7.4 (3.0)
- Published
- 2017-10-20
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-295
Affected products
- f5 / big-ip_policy_enforcement_manager / 12.1.0
- f5 / big-ip_policy_enforcement_manager / 12.1.1
- f5 / big-ip_policy_enforcement_manager / 12.1.2
Matched remediation archetype
Cryptography, certificate, signature, and channel validation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Inventory affected algorithms, key uses, trust stores, certificate validation settings, random sources, and plaintext channels across clients and services.
- Determine which secrets, identities, signatures, or data protections depend on the affected primitive or validation path.
- Check debug, compatibility, fallback, and hostname or audience override settings in build and runtime configuration.
Remediate safely
- Use a maintained platform cryptographic API with approved algorithms, modes, parameters, randomness, and full peer identity validation.
- Remove insecure fallback and validation bypasses; separate keys by purpose and load them from managed secret storage.
- Plan rotation or reissuance for affected keys, certificates, tokens, hashes, or ciphertext and document compatibility sequencing.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.