CVE intelligence and bounded remediation
CVE-2016-9256 — F5 Big-Ip Local Traffic Manager security vulnerability
In F5 BIG-IP 12.1.0 through 12.1.2, permissions enforced by iControl can lag behind the actual permissions assigned to a user if the role_map is not reloaded between the time the permissions are changed and the time of the user's next request. This is a race condition that occurs rarely in normal usage; the typical period in which this is possible is limited to at most a few seconds after the permission change.
- Severity
- High
- CVSS
- 7.5 (3.0)
- Published
- 2017-05-09
- CISA KEV
- Not currently listed
- Ecosystem
- software/application
- Weaknesses
- CWE-362
Affected products
- f5 / big-ip_local_traffic_manager / 12.0.0
- f5 / big-ip_local_traffic_manager / 12.1.0
- f5 / big-ip_local_traffic_manager / 12.1.1
- f5 / big-ip_local_traffic_manager / 12.1.2
- f5 / big-ip_application_acceleration_manager / 12.0.0
- f5 / big-ip_application_acceleration_manager / 12.1.0
Matched remediation archetype
Race condition, TOCTOU, and lifecycle synchronization
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Map concurrent actors, shared state, lock boundaries, signals, callbacks, retries, and check-then-use sequences in the affected path.
- Determine whether untrusted users can influence timing, object names, filesystem state, or repeated state transitions.
- Identify clustered and multi-process behavior that repository-local tests may not represent.
Remediate safely
- Make the sensitive state transition atomic or protect it with a consistently ordered synchronization primitive.
- Perform authorization and invariant checks on the same authoritative object and transaction used for the operation.
- Use unique private resources, safe ownership transfer, and idempotent operations; add deterministic concurrency regression tests.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.