CVE intelligence and bounded remediation
CVE-2015-1142857 — On multiple SR-IOV cars it is possible for VF's assigned to guests to send ethernet flow control pause frames via the PF
On multiple SR-IOV cars it is possible for VF's assigned to guests to send ethernet flow control pause frames via the PF. This includes Linux kernel ixgbe driver before commit f079fa005aae08ee0e1bc32699874ff4f02e11c1, the Linux Kernel i40e/i40evf driver before e7358f54a3954df16d4f87e3cad35063f1c17de5 and the DPDK before commit 3f12b9f23b6499ff66ec8b0de941fb469297e5d0, additionally Multiple vendor NIC firmware is affected.
- Severity
- High
- CVSS
- 8.6 (3.0)
- Published
- 2018-01-23
- CISA KEV
- Not currently listed
- Ecosystem
- operating-system
- Weaknesses
- CWE-254
Affected products
- intel / x710_firmware
- intel / 82599_firmware
- intel / x540_firmware
- intel / i350_firmware
- intel / 82576_firmware
- linux / linux_kernel_ixgbe
Matched remediation archetype
General vulnerability remediation
This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.
Check exposure
- Confirm the affected component, deployment paths, reachable interfaces, and enabled features from inventories and configuration, without probing production destructively.
- Compare the advisory's affected conditions with the repository lockfiles, build manifests, artifacts, and runtime inventory.
- Identify data sensitivity, trust boundaries, and privilege level for every confirmed affected deployment.
Remediate safely
- Apply a vendor-supported fix or remove the affected component or feature; record the selected change and its source in the repository.
- Update direct and transitive dependency locks, generated artifacts, deployment manifests, and asset inventories together.
- Add a regression test for the documented unsafe condition using inert inputs and preserve rollback instructions.
Authoritative sources
Complete CVE record and remediation plan
The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.