CVE intelligence and bounded remediation

CVE-2009-20008 — Green Dam Youth Escort version 3.17 is vulnerable to a stack-based buffer overflow when processing overly long URLs

High CVSS 8.6

Green Dam Youth Escort version 3.17 is vulnerable to a stack-based buffer overflow when processing overly long URLs. The flaw resides in the URL filtering component, which fails to properly validate input length before copying user-supplied data into a fixed-size buffer. A remote attacker can exploit this vulnerability by enticing a user to visit a specially crafted webpage containing a long URL, resulting in arbitrary code execution.

Severity
High
CVSS
8.6 (4.0)
Published
2025-08-30
CISA KEV
Not currently listed
Ecosystem
software/application
Weaknesses
CWE-121

Affected products

No browser-safe affected-product rows are available.

Matched remediation archetype

Buffer bounds, memory safety, and memory corruption

This catalog composition supplies bounded fallback guidance. Explicitly reviewed curated workflows load with the complete record below.

Check exposure

  • Identify affected native-code versions, build flags, architectures, parsers, codecs, drivers, and input paths in all shipped artifacts.
  • Determine whether untrusted data reaches the affected routine and the process privilege, sandbox, and network exposure.
  • Confirm statically linked, vendored, firmware, and platform-provided copies, not only package-manager records.

Remediate safely

  • Apply the maintained upstream correction or replace the affected component, then rebuild every dependent artifact from clean inputs.
  • Adopt bounds-checked interfaces, validated sizes and integer conversions, clear ownership, and memory-safe components where practical.
  • Enable supported compiler and runtime hardening and add sanitized tests and fuzz regression seeds derived from non-weaponized fixtures.

Authoritative sources

Complete CVE record and remediation plan

The detailed catalog view below loads this exact record, its source evidence, and the full seven-phase agentic change plan.